Contacts
Construction of a dam to take advantage of the runoff from the Potosí River. The intake site will be close to the existing aqueduct (Cerro Prieto-PP San Roque), with a conduction line and pumping equipment, the water from this new dam would be incorporated into that aqueduct.
Design, expansion, modernization, equipment, operation and maintenance of the National Meteorological System.
Design, construction, equipment, operation and maintenance of a WWTP in San Antonio de los Buenos, Tijuana.
Modernization, equipment, operation, administration of the Municipal Operator of the Potable Water System of the Municipality of La Paz, Baja California Sur.
Design, construction, operation and maintenance of a desalination plant in Los Cabos, Baja California Sur.
Construction, operation and maintenance of 21 wastewater treatment plants, in the State of Mexico and Mexico City.
Modernization, equipment, operation, administration, maintenance and conservation of the national networks for measuring surface water, piezometric groundwater monitoring and water quality monitoring.
Design, construction, equipment, operation, administration and maintenance of the urban tourist lightweight transport system of the city of Cancún, Quintana Roo.
Design, construction, equipment, operation and maintenance of the Cancun - Tulum train, in the state of Quintana Roo.
Construction of a 852 km railway system from Cancun to Palenque to link various cities in southeast Mexico.
Design, construction, operation and maintenance of the transport infrastructure of the Jáltipan Pipeline, from Veracruz to Salina Cruz, in the States of Veracruz and Oaxaca.
Tender for the provision of strategic natural gas storage service, limited to sites declared as economically unfeasible for the extraction of hydrocarbons, previously nominated and will consider the constitution of at least 10 BCF (Billions of cubic feet).
Modernization, operation, maintenance and conservation of the roads and bridges that make up the southeast package, in the states of Campeche, Chiapas, Tabasco and Veracruz.
Maintenance and conservation of the Las Brisas-Los Mochis road section in the States of Sinaloa and Sonora.
Expansion, modernization, maintenance and conservation of federal highway 307 in the Bacalar-Tulum section, in the State of Quintana Roo.
Improve the country’s transportation network, particularly in the State of Oaxaca and the State of Guerrero.
This corridor would connect Mexico’s Pacific coast with the eastern coast of the United States.
The macro-project consists of carrying out a construction dredging, of approximately 5 million m3, to increase the capacity of the port's navigation areas. The navigation channel would go from 150 to 180 m wide and from 8 to 10 km in length, the ciaboga dock would go from 400 to 600 m in diameter, all at a depth of 14 m to achieve an official draft of 12.8 m.
Design, construction, equipment, installation, operation, maintenance and exploitation of the specialized containers terminal II, in the port of Manzanillo in Vaso II of the Cuyutlán lagoon, Colima.
Design, construction, equipment, installation, operation, maintenance and exploitation of a specialized cruise terminal in Mazatlán, Sinaloa.
Design, construction, equipment, installation, operation, maintenance and exploitation of the specialized containers terminal I, in the port of Manzanillo in Vaso II of the Cuyutlán lagoon, Colima.
Design, construction, installation, operation and maintenance of a complementary sanitary landfill to the existing one.
Solid waste treatment plant.
Construction, expansion and modernization of the subway line of the collective transportation system, Chalco-La Paz section, in the east of the State of Mexico and Mexico City.
Construction, expansion and modernization of line 4 of the Metro Collective Transportation System, Martín Carrera-Tepexpan section, in the State of Mexico and Mexico City.
Solid waste treatment plant.